Material Calculator

Estimate gravel, concrete, mulch, sand, topsoil and pavers in cubic yards, tons or bags.

Material
Project presets 1-tap auto-fill
Area shape
Common depths
% slope
12 ft 8 ftdepth 3 in
Drawing updates as you type. Open 3D to see the depth, or larger view to inspect it.
Price & Quantity Estimator Optional
Typical price

You need

0.89 yd³

Order 0.98 yd³ to allow 10% for settling and waste

What to ask your supplier Click to open
Cubic feet
24 ft³
Cubic meters
0.68 m³
Weight
1.37 tons
Area
96 ft²
Moisture & Compaction Tonnage Range Density variance ±15%
Dry / Loose –
Delivered –
Wet / Compacted –

Jobsite & Hauling Equivalents

~9 Wheelbarrows (3 ft³)
~3 Pickup Loads (½ ton)
1 Dump Trucks (12 yd³)
🚚 Delivery Logistics & Dump Truck Loads Recommended option
– 1/2-Ton Pickup (1.5 yd³ max)
– Single-Axle Dump (5–6 yd³)
– Tandem Dump (10–12 yd³)
– Tri-Axle Dump (15–18 yd³)

⚠️ Delivery tip: Commercial dump trucks require ~10 ft width clearance and 14 ft overhead clearance for bed tipping.

Gravel (loose) settles and spreads unevenly, so the 10% allowance covers it. Suppliers sell by the yard or the ton; figures are estimates.

Quick estimating rule of thumb

To estimate bulk material: Length (ft) × Width (ft) × Depth (in) ÷ 324 = Cubic Yards. Multiply cubic yards by material density (e.g., 1.4 for gravel, 1.35 for sand, 1.1 for topsoil, 0.5 for mulch) to get tons. Always order 10% extra for settling and waste.

A material calculator that shows its work

Order too little bulk material and the job stops while you wait for a second delivery. Order too much and you have paid to have a pile of gravel hauled onto your driveway that you now have to move. This material calculator exists to get that number right the first time. It covers gravel, concrete, mulch, sand, topsoil, crushed stone and pavers, and it shows you the measurements it is working from so you can sanity-check them before you call the yard.

Enter the length, width and depth of the area you are filling. The drawing beside the inputs redraws as you type, with the dimensions marked the way they would be on a site plan, so a transposed number or a wrong unit is easy to catch. The result comes back in cubic yards, cubic feet, cubic metres and tons, plus the amount to actually order once a settling allowance is added.

How the calculation works

Every bulk-material estimate is the same three steps. First, the area: length times width for a rectangle, π times the radius squared for a circle, half base times height for a triangle. Second, the volume: area times depth, with the depth converted to the same unit as the area. Third, the conversion that trips people up: there are 27 cubic feet in a cubic yard, so cubic feet divided by 27 gives the cubic yards a supplier will quote.

Weight is volume times density. A cubic yard of dry gravel or sand runs about 1.3 to 1.4 tons, screened topsoil about 1.1 tons, wood mulch only about half a ton because it is mostly air, and mixed concrete about two tons. Those densities vary with moisture and how compacted the material is, which is the main reason the figures here are estimates and the reason for the waste allowance.

Why order ten percent extra

The calculator defaults to a 10% over-order and shows both numbers. Bulk material compacts under its own weight and under traffic, so a bed that measures three inches deep loose settles shallower. Ground is never perfectly level, spreading wastes some at the edges, and a delivered ton is weighed with normal moisture that later dries off. For a small job, rounding up to the nearest half yard does the same thing. For gravel driveways and structural fill, some contractors go to 15%.

Cubic yards or tons, depending on the quote

Landscape supply yards usually price soil, mulch and compost by the cubic yard and stone, gravel and sand by the ton. Quarries almost always sell by the ton. Ready-mix concrete is sold by the cubic yard with a short-load fee below about a yard. Because this calculator reports volume and weight side by side, you can take whichever number matches how your supplier quoted and check the other against it.

Measuring an area that is not a clean rectangle

Most real yards, beds and patios are not tidy rectangles. The reliable approach is to break the space into shapes you can measure (rectangles, triangles and circles), run each through the calculator, and add the results. The tool keeps a running total when you set the number of areas, so three garden beds of the same size only need to be entered once. For a long curved border, approximate it as a ring by entering the outer and inner width; for an irregular blob, box it into the smallest rectangle that contains it and subtract the corners you know are empty.

Depth matters more than people expect. Because volume scales directly with depth, spreading gravel an inch deeper than planned over a 400-square-foot area adds a third of a cubic yard, most of a wheelbarrow every few feet. Decide the finished depth before you measure, and measure from the compacted sub-base, not from loose soil that will pack down.

Common estimating mistakes

The three that cost the most are mixing units (feet on one input and inches on another), forgetting to divide by 27 when converting to cubic yards, and ordering the exact calculated amount with no allowance. A fourth is trusting a bag-count estimate for a large pour: past roughly half a cubic yard, bagged concrete costs far more per yard than ready-mix and takes far longer to place. This calculator guards the first two by converting every input to a common unit for you and showing the cubic-yard figure explicitly, and it flags the bag comparison on the concrete pages.

Common quantities at a glance

Handy figures for checking a supplier’s quote or estimating in your head. The how we calculate page shows every formula, the density tables and the sources behind these numbers.

How much is a cubic yard?

Bulk material is sold by the cubic yard. These are the numbers behind that unit.

1 cubic yard
27 cubic feet0.765 m³202 US gallons A cube 3 ft on every side. Almost everything loose (stone, soil, mulch, ready-mix) is quoted and delivered in these.
What 1 cubic yard covers
324 ft² at 1″162 ft² at 2″108 ft² at 3″81 ft² at 4″ Depth is what drives the order. Double the depth and you halve the area one yard will cover.
1 ton of gravel covers
~100 ft² at 2″~50 ft² at 4″ Gravel runs about 1.4 tons per cubic yard, so a ton is roughly ¾ of a yard. Useful when a supplier prices by the ton and you measured in yards. Gravel calculator
1 cubic yard of mulch
13.5 bags of 2 ft³covers ~160 ft² at 2″ Bagged mulch costs far more per yard than bulk. Past about a yard, a delivered load is usually cheaper even with the delivery fee. Mulch calculator
Concrete for a 10×10 slab
4″ ≈ 1.23 yd³6″ ≈ 1.85 yd³ A 100 ft² pad. Thickness matters more than area: going from 4″ to 6″ adds half a yard to the same slab. Slab calculator
Concrete bags per cubic yard
45 bags (80 lb)60 bags (60 lb)72 bags (50 lb)90 bags (40 lb) Past about half a yard (some 23 of the 80 lb bags), ready-mix is cheaper per yard and far quicker to place. Every bag size

Converting between units

Mixing units is the mistake that costs the most. These three conversions cover nearly all of it.

Inches of depth to feet
1″ = 0.083 ft2″ = 0.167 ft3″ = 0.25 ft4″ = 0.333 ft6″ = 0.5 ft Divide inches by 12 first. Multiplying square feet by a depth still written in inches is how an order comes out 12× too big.
Cubic feet to cubic yards
divide by 27 Length × width × depth, all in feet, gives cubic feet. Divide by 27 for the figure your supplier wants.
Cubic yards to tons
gravel × 1.4sand × 1.35topsoil × 1.1concrete × 2.0mulch × 0.5 Multiply by the density of that material. Divide instead to go from a quoted tonnage back to yards. Full density table

Before you order

What a delivery actually looks like, and how much to add on top of the calculated figure.

Tandem dump truck
10–14 cubic yards≈15–20 tons One full load. Check the truck can reach the drop point and that you have somewhere to put a pile that size.
Recommended over-order
10% typical15% for driveways Covers settling, compaction and spillage. Running short means a second delivery fee for a fraction of a load.

Pick the calculator for your material

The tool above defaults to gravel. Each material has its own page with the right density built in, the bag sizes that apply, and a guide to depths and coverage: the gravel calculator, mulch calculator, concrete slab calculator, sand calculator, topsoil calculator, landscape rock calculator and #57 crushed stone calculator. For a general pour, the concrete calculator also gives you bag counts for 40, 60 and 80 lb mixes.

Frequently asked questions

How do I calculate how much material I need?

Multiply the area you are covering (length × width for a rectangle) by the depth, keeping every measurement in the same unit. Divide cubic feet by 27 to get cubic yards, which is the unit most suppliers quote. This calculator does that for you and adds a waste allowance.

How many cubic yards are in a ton?

It depends on the material. A ton of dry gravel or sand is roughly 0.7 cubic yards; a ton of screened topsoil is closer to 0.9; mixed concrete is about 0.5. The calculator converts using a typical density for each material.

How much does a cubic yard weigh?

A cubic yard of gravel weighs about 1.4 tons, sand about 1.35 tons, screened topsoil about 1.1 tons, wood mulch about 0.5 tons, and mixed concrete about 2 tons. Wet material weighs more.

How many 80 lb bags of concrete make a cubic yard?

About 45. An 80 lb bag yields roughly 0.6 cubic feet, and there are 27 cubic feet in a cubic yard. A 60 lb bag yields about 0.45 cubic feet, so it takes about 60 of those.

How deep should gravel be for a driveway?

Plan on 4 to 6 inches of gravel for a residential driveway, often in two layers of different stone sizes. For a walking path or patio base, 2 to 3 inches is usually enough over a compacted sub-base.

How deep should mulch be?

Two to three inches for most beds, up to four inches for weed suppression around trees and shrubs. More than four inches can starve roots of air and hold too much moisture against stems.

How much extra material should I order?

Ten percent is the usual allowance. Bulk material settles and compacts, spreads unevenly, and some is lost in handling. The calculator shows both the exact figure and the amount to order.

How do I convert cubic feet to cubic yards?

Divide by 27. A cubic yard is 3 ft × 3 ft × 3 ft = 27 cubic feet. So 54 cubic feet is 2 cubic yards.

How much area does a cubic yard of mulch cover?

About 160 square feet at 2 inches deep, or roughly 108 square feet at 3 inches. One cubic yard equals 324 square feet at 1 inch.

What is the difference between #57 stone and 3/4-inch gravel?

#57 is a washed, angular crushed stone roughly 3/4 inch across with the fines screened out, so it drains well and is used for drainage and as a base. "3/4 minus" keeps the fine material, so it compacts hard and is used for driveways and pack.

Do suppliers sell by the yard or by the ton?

Landscape yards usually sell soil, mulch and compost by the cubic yard, and stone, gravel and sand by the ton. Quarries almost always sell by the ton. The calculator gives you both so you can match the quote.

How much is a truckload of gravel or topsoil?

A standard tandem dump truck carries about 10 to 14 cubic yards. Price varies widely by region and material, from around $15 to $60 per cubic yard delivered plus a haul fee. Enter your local price per yard or ton to get a cost estimate.

How do I calculate concrete for a slab?

Multiply the slab length by its width by its thickness, all in feet, then divide by 27 for cubic yards. A 10 ft × 10 ft slab at 4 inches thick is about 1.23 cubic yards. Use the concrete calculator for bag counts.

Is this calculator free?

Yes. Every calculator on the site is free, needs no sign-in, and works on a phone at the store or the job site.