The short answer

4 inches of gravel for a residential driveway (6–8 in two layers if trucks use it), 2–3 inches for a footpath or bed, 4–6 inches of compacted base under pavers (up to 12 in freezing climates or under a drive), 12 inches of washed stone around a French drain pipe, and 3–4 inches for a dog run or play area.

  • 4″ depth Driveway Residential, on good base
  • 2–3″ depth Paths & beds Foot traffic only
  • 4–6″ compacted Paver base 8–12″ where it freezes
  • 12″ stone French drain Around the pipe
  • 3–4″ depth Dog run Pea gravel or DG
  • 2″ depth Top-up layer Refreshing existing stone

How deep gravel should be depends on what will drive, walk or drain through it. A garden path needs two inches. A driveway that takes a delivery truck needs eight, in two different materials. Getting this wrong is expensive in both directions: too shallow and the stone works into the soil and ruts within a season, too deep and you have paid for material that does nothing.

The depths below are finished, compacted depths: what you want when the job is done. Because dense-graded stone loses roughly 20–25% of its loose volume under a plate compactor, you order more than this. Every calculator on this site adds that allowance for you.

Gravel depth by project

Recommended finished depth, by job
ProjectDepthMaterialNotes
Residential driveway (cars)4″Road base, or base + 1″ toppingOver compacted subgrade and fabric
Driveway (trucks, RV, farm)6–8″4″ base + 2–4″ surface stoneTwo layers, compacted separately
Driveway on soft or clay soil8–12″Base + geotextile fabricFabric is not optional here
Garden or utility path2–3″Pea gravel, DG, 3/8″ stoneNeeds edging or it migrates
Patio surface (loose stone)3″Pea gravel or DG over baseOver 2″ of compacted base
Paver / flagstone base4–6″Road base or 3/4″ minus8–12″ in freeze-thaw climates
Paver base under a driveway8–12″Road base, compacted in liftsPlus 1″ of bedding sand
French drain12″#57 washed stoneAround the pipe, wrapped in fabric
Foundation / footing drain12–18″#57 washed stoneAbove and around the pipe
Dry well24–36″#57 washed stoneSized to the runoff volume
Dog run3–4″Pea gravel over baseRounded stone only, for paws
Playground surfacing9–12″Pea gravel or rubber mulchFall-height driven; check ASTM F1292
Shed or slab sub-base4–6″Road base, compactedUnder the vapour barrier
Fire pit base4–6″Crushed stoneDrains and prevents heat spalling
Refresh an existing surface1–2″Same as original surface stoneRake and compact into what is there

Why depth matters more than material

A gravel surface does not work by being hard. It works by spreading a load over enough subgrade area that the soil beneath can carry it. The deeper the layer, the wider the cone of pressure at the bottom, and the less stress lands on any one square inch of soil.

That is why a driveway on sand can get away with four inches while the same driveway on wet clay needs eight to twelve. It is not the stone that failed in a rutted driveway; it is the soil under it, pumping up through a layer too thin to protect it. Adding geotextile fabric between soil and stone is the other half of the answer: it stops the two mixing, which is what actually destroys a thin gravel layer over time.

Building it in layers

Anything over about four inches should go down in lifts: layers of three to four inches, each compacted before the next goes on. A plate compactor cannot densify eight inches of loose stone in one pass; the top compacts, the bottom stays loose, and the surface settles unevenly in the first wet month.

  1. Excavate to the full finished depth plus any topsoil you are stripping, and grade for drainage: a crown or a 1–2% fall.
  2. Compact the subgrade. Stone laid on loose soil settles into it no matter how deep it is.
  3. Lay geotextile fabric over the subgrade. On clay or anywhere that stays wet, this is the single highest-value thing on the list.
  4. First lift: 3–4″ of dense-graded base, raked level, then compacted with a plate compactor or roller. Dampen it: dry stone will not compact.
  5. Second lift: another 3–4″ if the design calls for it, compacted the same way.
  6. Surface layer: 1–2″ of the stone you actually want to look at, raked but only lightly compacted.

The gravel driveway calculator handles the two-layer build directly, and the paver base calculator does base plus bedding sand for a paver install.

What each depth costs you in material

Depth is the most expensive variable in the whole job, because it multiplies straight through. Doubling the depth doubles the material. Here is what one cubic yard covers at each of the common depths:

Square feet one cubic yard covers at each depth
Depthft² per yd³ft² per ton of gravelyd³ for 500 ft²
1″3242311.54
2″1621163.09
3″108774.63
4″81586.17
6″54399.26
8″412912.35
12″271918.52

The jump from 4 to 6 inches on a 600 square foot driveway is 3.7 extra cubic yards, over five tons of stone and a few hundred dollars. Worth it if trucks use the drive or the soil is poor; wasted if neither is true.

The five depth mistakes

  • Spreading a driveway's worth of stone in one lift. It will look right and settle into ruts by the second wet month.
  • Skipping the fabric on clay. Stone and clay will mix, and once mixed the layer has no structural depth left at all.
  • Using rounded stone as a base. Pea gravel and river rock never lock together: they roll. Bases need angular, dense-graded stone with fines.
  • Ordering the finished depth. Compacted base loses 20–25% of its loose volume, so ordering the finished figure leaves you short.
  • Deep loose gravel as a walking surface. Anything over about 3 inches of loose stone is unpleasant to walk on and impossible to push a wheelbarrow through.

Once you have settled on a depth, the gravel calculator turns it into cubic yards, tons and a delivered cost, with the compaction allowance included. If your supplier has quoted a per-ton price, the cubic yards to tons guide converts between the two.

Last reviewed 2026-09-07. Figures here are typical ranges, not a quote: if a local supplier gives you a number for their product, use theirs. Something wrong? Email hello@bulkmaterialcalculator.com.

Frequently asked questions

How deep should gravel be for a driveway?

Four inches of compacted stone for a residential driveway carrying cars, over a compacted subgrade with geotextile fabric. If delivery trucks, an RV or farm equipment use it, or the soil is soft clay, go to six to eight inches built in two compacted lifts.

How deep should gravel be for a path?

Two to three inches is right for a footpath. Deeper loose stone is genuinely unpleasant to walk on and impossible to push a barrow through. Use edging, or the stone migrates into the beds either side within a season.

How deep should the base be under pavers?

Four to six inches of compacted road base for a patio or walkway, plus one inch of bedding sand. In freeze-thaw climates go to eight inches, and under a driveway eight to twelve inches compacted in lifts.

How deep should a French drain be?

The trench is typically 18 to 24 inches deep, with about 12 inches of washed #57 stone around the perforated pipe and the whole assembly wrapped in filter fabric. What matters more than absolute depth is continuous fall: at least 1 percent, or one inch every eight feet.

Is 2 inches of gravel enough for a driveway?

No. Two inches will rut within a season under vehicle traffic because it is too thin to spread the load over the subgrade. Two inches is a top-up layer on an existing driveway, not a driveway.

How deep should gravel be for drainage?

Around a French drain pipe, about 12 inches of washed angular stone. For a footing drain, 12 to 18 inches. For a dry well, 24 to 36 inches sized to the runoff volume. Always use washed single-size stone such as #57: fines clog the voids that make drainage work.

Do I need to compact gravel?

Dense-graded base material with fines in it, yes: compact it in three to four inch lifts, dampened. Washed single-size drainage stone cannot meaningfully compact and does not need to. Decorative surface stone gets a light pass only.

How much extra gravel should I order for compaction?

Ten to fifteen percent over the finished volume for a surface layer, and twenty to twenty-five percent for a compacted base. The calculators on this site apply that allowance and show both the raw and the order figure.

How deep should gravel be for a shed base?

Four to six inches of compacted road base, extending about a foot past the shed footprint on every side so the edges do not undermine. Level it carefully: a shed telegraphs an out-of-level base into doors that will not shut.

How deep should gravel be for a dog run?

Three to four inches of rounded pea gravel or decomposed granite over a compacted base. Use rounded stone rather than angular crushed stone, which is hard on paws, and skip anything with sharp fines.

What happens if gravel is too deep?

On a surface, it stays loose, ruts under tyres and is hard to walk on, because there is nothing beneath to compact against. On a base it is simply money spent on material that carries no extra load. Depth beyond what the soil needs buys nothing.

Do I need fabric under gravel?

On clay, silt or anywhere that holds water, yes: geotextile fabric is the difference between a driveway that lasts ten years and one that ruts in two. On free-draining sandy soil it is optional, though still cheap insurance against stone loss into the subgrade.

How deep should gravel be under a concrete slab?

Four to six inches of compacted road base under a residential slab, with the vapour barrier laid on top of the stone rather than under it. Follow whatever your local code and the slab design specify: this is one to check rather than to assume.

How many inches of gravel do I need for 500 square feet?

At 2 inches deep, 500 square feet needs 3.1 cubic yards. At 3 inches, 4.6. At 4 inches, 6.2 cubic yards, which is about 8.7 tons of gravel. Add the compaction allowance on top of those figures.

Can I put new gravel over old gravel?

Yes, and it is the normal way to maintain a gravel drive. Rake out the ruts, fill the low spots, then add one to two inches of fresh stone of the same type and compact it in. Adding a decorative rounded stone over a dense-graded base works too, but do not put base material over decorative stone.